In this chapter we will be installing the Data Repository (CRC) Cell.

Order of Installation

The basic steps that will be taken during this installation are as follows:


Step 1:   Stop services (JBoss)

Step 2:   Edit CRC Loader configuration files

Step 3:   Edit CRC configuration files

Step 4:   Deploy the CRC Cell

Step 5:   Start services (JBoss)

Step 6:   Update CRC Data in i2b2 Admin

Step 7:   Update path in CRC table

Step 8:   Verify installation



The details of what is to be done for each step are defined in the different sections within this chapter. It is important to follow steps in the order they are defined and not to skip any of them unless otherwise noted.